日操夜操综合,亚欧在线精品免费观看一区,日韩AV不卡在线,中文字幕91在线国产V亚洲666,午夜国产精品一区在线观看,午夜鲁丝片久久国产精品丝袜国产,官方网站一区二区三区久久精品,日韩av无码综合先锋资源av男人

To provide customers with systematic
and intelligent water treatment solutions
Current location: Home Page > News > Industry Trends
Significance of dynamic simulation test of circulating cooling water
Time:2021-07-08 10:05:39
Article release:Admin
Original author:Unknown
Source:Internet

Significance of dynamic simulation test of circulating cooling water



Dynamic simulation test is a test method to study the corrosion and scaling of circulating cooling water system. Simulate the cooling water quality of the production site to prepare and directly use the site water if possible. The test tube is ∮10×1 or ∮19×2mm. The flow rate of water in the design pipe is about 1.0m/s, the water temperature at the inlet of the heat exchanger is 25 ~ 45℃, the temperature difference between the inlet and outlet is about 5℃, the fluctuation of the water temperature at the inlet is ±0.02℃, and the concentration multiple is 2 ~ 5 times. The test period is generally 7 ~ 14 days, some up to a month. Test tubes of the tube after knot speed check made by determination of fouling resistance, different temperature, the average pitting and scale thickness data, tube and coupon corrosion rate) and analyze the composition of scale sample made by comprehensive judgment of circulating cooling water corrosion and scaling tendency, the test device is dynamic, the heat transfer surface, as the single pipe or tube type heat exchanger, simulation of the cooler in the production of material, It is an ideal comprehensive test method to evaluate the water stable formula and process conditions in the laboratory. The experimental data can provide the basis for pilot test and field application.


Our company just developed in recent years, the introduction of domestic monitor of corrosion and scaling, its principle is the same as the scale and dynamic monitoring devices, this new instrument can not only assess dynamic scaling condition, a heat load, also to assess the corrosion condition, the difference is: corrosion fouling monitoring of heat exchange tube directly by electric heating, cold water flows through the heat pipe outside at the same time.





Label:
班玛县| 沁阳市| 从江县| 孝昌县| 华阴市| 孟村| 伊宁市| 会泽县| 凤冈县| 盐津县| 阿尔山市| 巴林右旗| 托克逊县| 天峨县| 青阳县| 肃宁县| 南通市| 邯郸县| 南郑县| 昌吉市| 辽中县| 石首市| 牡丹江市| 金堂县| 枞阳县| 高州市| 荔波县| 富源县| 孟州市| 郓城县| 二连浩特市| 南漳县| 乌鲁木齐市| 曲沃县| 郯城县| 措勤县| 沛县| 双江| 闻喜县| 上犹县| 大足县|